Wall and Tile Hacking for Residential Property at Bukit Panjang

Services Provided
Project Overview
This residential renovation project involved comprehensive demolition and hacking services, including wall hacking, floor and tile removal, and bathroom tiles and bathtub dismantling. The property, a multi-level residential unit in Singapore, required extensive preparatory work to pave the way for its transformation. Our team was tasked with removing outdated materials, including tiles, walls, and built-in fixtures, while prioritizing safety, protection of adjacent areas, and minimal disruption to neighboring units.
The scope of work included the systematic hacking and removal of structural elements, such as wall sections, flooring, and bathroom fixtures, to create a clean slate for the upcoming renovation. Throughout the project, we adhered to our stringent standards for quality workmanship, dust control, and client communication, ensuring the property was ready for its next phase of development.
Technical Challenges
1. Dust and Debris Management
Demolition in residential properties often presents the challenge of managing dust and debris, especially in environments where neighboring units are in close proximity. The removal of tiles, walls, and bathroom fixtures generated significant amounts of rubble, which required careful containment and disposal. Dust control measures, including the use of protective coverings on doorways, windows, and pipes, were critical to maintaining a clean and safe environment.
2. Protecting Non-Demolition Areas
Ensuring the integrity of areas not subject to demolition is essential in residential projects. This project involved working around existing pipelines, electrical wiring, and structural elements that were to remain intact. Protective measures, such as plastic sheeting, brown paper coverings, and temporary barriers, were implemented to safeguard these areas from damage during the hacking process.
3. Constrained Workspaces and Accessibility
Working within a multi-level residential property required careful planning to navigate confined spaces, particularly in rooms such as bathrooms and kitchens. The need to dismantle built-in fixtures and remove materials from tight corners added complexity to the project. Additionally, accessing the site with heavy-duty equipment while minimizing noise and disruption to neighboring units required strategic coordination.
4. Efficient Debris Removal
The volume of demolition debris, including broken tiles, concrete, and dismantled fixtures, posed logistical challenges in terms of collection and disposal. Ensuring the timely removal of debris while maintaining a safe and organized workspace was critical to preventing delays and maintaining project efficiency.
Project Considerations
Safety Measures
Our team prioritized safety throughout the project, ensuring that workers were equipped with protective gear, including face masks and gloves, to handle hazardous materials. Exposed electrical wiring and pipes were covered to prevent accidents, and the overall site was carefully managed to avoid unnecessary risks.
Protection of Adjacent Areas
Given the residential nature of the property, protecting adjacent areas was a top priority. Non-demolition areas were safeguarded with protective sheets, plastic coverings, and temporary barriers to prevent dust and debris from spreading. Doorways and windows were sealed to minimize disruption to other parts of the property and to neighboring units.
Communication and Client Requirements
Regular updates were provided to the homeowner and their interior designer through WhatsApp, ensuring clear communication and alignment with the project’s progress. This transparency allowed us to address any client-specific needs promptly and adapt our approach as required. Our commitment to minimal disruption and adherence to timelines ensured a smooth experience for the client.
Results
The project was successfully completed, meeting all client expectations and adhering to the highest standards of quality and professionalism. Our wall hacking, floor and tile removal, and bathroom tiles and bathtub hacking services were executed efficiently, leaving the property ready for its next phase of renovation.
The meticulous removal of old materials and fixtures transformed the space into a clean and organized environment, providing a solid foundation for the upcoming interior design work. Protective measures ensured that non-demolition areas remained intact, while effective dust control minimized disruption to neighboring units.
The client expressed satisfaction with the timely completion of the project and the professionalism demonstrated by our team. Through our systematic approach and attention to detail, we delivered a result that upholds HackingSG’s reputation as a trusted residential renovation contractor in Singapore. This project highlights our expertise in residential demolition and our commitment to delivering exceptional service tailored to the unique needs of every property.
Project Gallery













