Shop Reinstatement Services for Commercial Property at Beach Road

Services Provided
Project Overview
This commercial shop reinstatement project at Beach Road involved a comprehensive suite of reinstatement services, including general dismantling and disposal, wall hacking, floor and tile removal, and general painting and touch-up works. The objective was to return the unit to its original bare-shell condition in compliance with landlord requirements, ensuring it was ready for the next tenant.
Our team executed the dismantling and disposal of all built-in fixtures, including shelving, cabinetry, and signage, followed by careful removal of floor tiles and affected wall sections. After all hacking and removal work was completed, we performed patching and painting to restore all surfaces to a clean, uniform finish. As always, we maintained high standards of cleanliness and safety throughout the process.
Technical Challenges
Efficient Dismantling in a High-Footfall Area
As this property is located in a commercial zone with nearby active units, dismantling had to be done swiftly and quietly to avoid disruptions. Our team planned the dismantling works during off-peak hours where possible and used noise-dampening techniques to reduce disturbance.Wall Hacking with Structural Caution
Certain internal partition walls had to be removed, which required careful assessment to ensure no load-bearing or essential service lines were affected. We collaborated closely with building management and followed approved hacking guidelines.Dust and Debris Control
Given the extensive hacking and removal works, controlling dust and managing debris was a priority. Protective sheeting, vacuum tools, and daily clean-ups were employed to maintain site hygiene.Uniform Painting & Touch-ups Post Hacking
Once reinstatement work was completed, walls and ceilings needed uniform repainting. Our painting team ensured that all previously hacked and patched surfaces were smooth and color-matched with the original finish.
Project Considerations
Key considerations for this reinstatement project included:
Strict Timeline Compliance
Commercial leases often come with deadlines for reinstatement. We worked within a tight timeframe and completed the project ahead of schedule, enabling a smooth handover to the landlord.Waste Disposal and Clean Handover
All dismantled materials and debris were promptly removed from the premises and disposed of responsibly. The unit was swept, cleaned, and prepared for inspection without the need for post-project touch-ups.Coordination with Building Management
Due to the commercial nature of the unit, building management approval was required for certain works. We handled all necessary permit submissions and coordination, including scheduling hacking works and confirming disposal points.
Results
The Beach Road commercial unit was fully reinstated to a clean and original condition, meeting all landlord specifications. All reinstatement services—from dismantling and tile removal to wall hacking and final painting—were executed with professionalism and precision.
The unit was delivered on time and ready for the next phase of tenancy without issue. At HackingSG, we continue to uphold the highest standards in shop reinstatement projects across Singapore, ensuring compliance, cleanliness, and client satisfaction every step of the way.
Project Gallery











