HackingSG Logo

Door and Frame Removal for Residential Landed at Swiss View

Featured image for Door and Frame Removal for Residential Landed at Swiss View

Project Overview

A landed residential home in Singapore required the removal of an interior door and its frame to create an open passage between two living spaces. The homeowner sought a clean, precise demolition that would preserve the surrounding finishes and be ready for a swift paint touch‑up.

We were engaged to hack out the door slab and frame, safely dispose of the debris, make good the affected wall, and perform a seamless paint touch‑up. The project was completed on schedule, with the opening left flush to the existing plaster and ready for the homeowner’s interior design plans.

Technical Challenges

  1. Preserving Adjacent Plaster and Finishes
    The door was set within a plaster‑finished wall that matched the surrounding interiors. Removing the frame without damaging the surrounding plaster required careful chiselling and controlled hammering to avoid cracks or chips that would later need extensive repair.

  2. Structural Integrity of the Opening
    The original frame was anchored into the wall substrate. Hacking out the frame risked compromising the load‑bearing edge of the opening. We needed to ensure that the remaining wall edges stayed structurally sound while still allowing us to patch and finish the surface cleanly.

  3. Dust Containment in a Fully Occupied Home
    Residential demolition generates fine plaster dust that can travel to neighboring rooms. The challenge was to contain dust within a confined doorway area while the demolition crew worked, protecting the homeowner’s furniture, flooring, and personal items.

  4. Accurate Wall Patching for a Seamless Paint Finish
    After removal, the wall required a patch that blended perfectly with the existing texture and paint tone. Achieving a uniform surface without visible joints demanded precise mixing of plaster, careful feathering, and meticulous sanding before the final coat of paint.

Project Considerations

  • Protection of Non‑Demolition Areas – We laid protective sheeting on the floor and covered nearby furniture with plastic drapes. Labeled “D Protect” sheets were positioned to catch any falling debris, ensuring that only the doorway zone was exposed.

  • Minimal Disruption to Adjacent Units – Communication with the homeowner and the interior designer was maintained via WhatsApp, providing real‑time updates and confirming that work hours would not interfere with the family’s daily routine.

  • Dust Control Measures – In addition to floor protection, we employed dust‑sucking tools with HEPA filters and used a low‑pressure water mist to suppress airborne particles during the hacking process.

  • Quality of Workmanship – All cuts were made with precision tools, and the removal was performed in stages to continuously assess the condition of the surrounding plaster. After the frame was cleared, we applied a two‑layer patch, sanded to a smooth finish, and executed a colour‑matched touch‑up using premium interior paint.

  • Safety and Disposal – The door slab, timber frame, and all demolition waste were promptly collected in sealed bags and removed from the property in accordance with Singapore’s construction waste regulations.

Results

  • Flawless Opening – The doorway now presents a clean, rectangular opening with edges that are flush to the surrounding wall, ready for the homeowner’s design vision.

  • Seamless Finish – The patched area blends indistinguishably with the existing plaster, and the paint touch‑up restores a uniform colour and texture across the entire wall surface.

  • Zero Impact on Adjacent Spaces – Post‑project inspections confirmed that no dust or debris migrated beyond the protected zone, preserving the integrity of nearby rooms and furnishings.

  • Client Satisfaction – The homeowner praised the professionalism of the crew, the clear communication throughout the process, and the speed with which the demolition and finishing stages were completed.

  • Enhanced Property Functionality – By removing the door and frame, we have created a wider, more fluid circulation path between rooms, adding both aesthetic appeal and functional value to the residence.

At HackingSG, we take pride in delivering precise demolition and finish work that respects the home environment

Project Gallery

Door and Frame Removal for Residential Landed at Swiss View - Image 1
Door and Frame Removal for Residential Landed at Swiss View - Image 2
Door and Frame Removal for Residential Landed at Swiss View - Image 3
Door and Frame Removal for Residential Landed at Swiss View - Image 4
Door and Frame Removal for Residential Landed at Swiss View - Image 5
Door and Frame Removal for Residential Landed at Swiss View - Image 6
Door and Frame Removal for Residential Landed at Swiss View - Image 7

More Projects

Explore our other successful projects

Ready to get started?

Work with Singapore's leading commercial and office reinstatement contractor

Contact us to discuss your project and learn how we can transform your space to suit your needs.