Built-in Carpentry and Tile Removal for Residential Unit at Serangoon Avenue 3

Services Provided
Project Overview
This residential renovation project involved comprehensive dismantling and removal services tailored to the property’s needs. Focusing on built-in carpentry removal, cabinet dismantling, kitchen demolition, and extensive floor and tile removal, the project aimed to prepare the space for a complete transformation. The property, a high-rise residential unit, showcased modern finishes prior to our intervention, with built-in cabinets, a functional kitchen, and tiled bathrooms. Our role was to methodically dismantle these features while ensuring the structural integrity of the property and minimizing disruption to the surrounding units.
The project demanded a meticulous approach to dismantling and removal, ensuring that the property was left in a clean, debris-free state, ready for the next phase of renovation. With an emphasis on professionalism, dust control, and the protection of non-demolition areas, we successfully delivered a high-quality outcome that reflects our expertise in residential renovation.
Technical Challenges
1. Cabinet and Built-in Carpentry Removal
The property featured several built-in carpentry elements, including storage cabinets in the entryway and living areas, as well as kitchen cabinets. Dismantling these fixtures without damaging the surrounding walls, floors, or doorways required precision and expertise. The limited space in certain areas, such as the kitchen, added complexity, necessitating careful handling of tools to avoid scratching or denting adjacent surfaces.
2. Kitchen Demolition in a Confined Space
The kitchen, equipped with built-in cabinets, countertops, and appliances, required comprehensive demolition. Working within the constraints of a compact residential kitchen posed challenges in maneuvering equipment and disposing of dismantled materials. Additionally, the presence of plumbing and electrical fixtures, such as exposed pipes, required extra caution to ensure that no unintended damage occurred during the dismantling process.
3. Tile Removal in Bathrooms
The bathrooms featured tiled walls and floors that needed to be removed entirely. Bathroom demolition work presented unique challenges, such as the careful removal of tiles without damaging the underlying waterproofing layer or existing plumbing fixtures. The presence of recessed areas, such as shower zones, added complexity, as these areas required precise hacking and preparation for future reinstatement.
4. Debris Management in a High-Rise Setting
Given the property’s high-rise nature, managing and disposing of demolition debris presented logistical challenges. Ensuring minimal disruption to neighboring units while maintaining a clean and safe workspace required thorough planning. Dust and noise control in shared residential environments were critical considerations throughout the project.
Project Considerations
Safety and Containment Measures
Ensuring the safety of the property and its occupants was a top priority. Non-demolition areas were carefully protected to prevent accidental damage, and dust containment measures, such as plastic sheeting and tarps, were implemented to minimize the spread of debris. This was especially important in shared spaces, such as hallways and living areas, where dust and debris could easily affect adjacent rooms.
Noise and Disruption Control
As a high-rise residential unit, the project required a focus on minimizing noise and disruption to neighboring units. We scheduled noisy activities, such as tile hacking and cabinet dismantling, during permissible hours and maintained clear communication with the client to coordinate work schedules.
Precision Dismantling
The dismantling process required a high level of precision to protect critical features, such as electrical outlets, plumbing work, and doorways. For instance, in the bathrooms, exposed pipes and drains were carefully preserved while tiles and fixtures were removed. Similarly, built-in cabinets were dismantled without damaging adjacent walls, ensuring the property was left in excellent condition for the next renovation phase.
Cleanliness and Organization
Throughout the project, we emphasized cleanliness and organization. Debris was promptly collected and contained in designated areas, such as bags and buckets, to maintain a neat workspace. Tools and materials were stored safely to avoid clutter and hazards, reflecting our commitment to professionalism and safety.
Results
The project concluded successfully, with all dismantling and removal services completed to the highest standards. Built-in cabinets in the entryway, living areas, and kitchen were carefully removed, leaving the surrounding walls and doorways intact and damage-free. In the bathrooms, wall and floor tiles were thoroughly hacked and removed, exposing the structure for future renovation work while preserving critical features like drains and plumbing connections.
Floor and tile removal services were performed with precision, leaving the property in a clean, debris-free state. The thoroughness of our work ensured that no remnants of previous finishes remained, providing a blank slate for the next stage of renovation. Dust containment measures and careful debris management minimized disruption to the surrounding units, ensuring a smooth and professional experience for the client.
By adhering to our high standards of workmanship and customer service, we delivered a project that not only met but exceeded client expectations. The property is now ready for its transformation, with the dismantling and removal phase completed seamlessly. At HackingSG, we take pride in our ability to prepare residential properties for renovation with precision, care, and professionalism, ensuring every project is executed with excellence.